There are 3 repositories under critical-path topic.
Grunt task to extract & inline critical-path CSS from HTML
Inline critical path CSS and async load existing stylesheets
High performance critical css extraction with a great configuration abilities
A browser widget to extract Critical CSS and Full CSS from a page. Can be used via the browser console.
Eliminate render-blocking CSS in above-the-fold content
MATLAB implementation of all the Operations Research algorithms and problems solved by me.
Client for critical-css-server. Eliminate render-blocking CSS in above-the-fold content.
Java application designed to solve the Critical Path Method (CPM) problem.
Inline critical CSS in HTML page using Puppeteer and Critical-css-parser
Detects Above the Fold styles on sites and assembles a stylesheet of them.
Get critical (above-the-fold) and the rest CSS using Puppeteer
A fast webpack plugin for inlining critical (above-the-fold) css
Enumeration of all Permutations (Recursion, Single Swap, and in Lexicographic Order), and Combinations. Enumeration of all Topological Orderings on a Directed Graph. Enumeration of all Paths in a connected Graph. Evaluates Critical Path using PERT Algorithm.
Estimation tools set.
System that finds the critical path of the graph of the disciplines of the Computer Science course at UnB (University of Brasília).
Simple calculator for finding the critical path through CPM and PERT
Finding critical path on large graph using Bellman-Ford algorithm with parallel implementations
Program for selecting vertices that have a sign of implicit transition
Offline-first PWA card game
A developer-centric frontend performance library
Grunt task to extract Above the Fold CSS from a URL
Algorithm implementation for critical path in c++ and javascript
React bindings for @figliolia/metrics
Finds the critical path in the network and also displays the EST, EFT, LST, LFT and slack time for each activity.
run critical path generator in a docker container
Practicing website optimization by analyzing the critical render path, identifying code bottlenecks with Chrome Dev Tools, and minifying website assets.
Graphical Java application using implementation of critical path analysis for optimal day planning.
Udacity: Front End Web Development Project - "Website Optimization"
Projeto desenvolvido como parte do curso Performance Web da escola Alura, ministrado pelo instrutor Sergio Lopes.