mariusCristianPop / manual-testing-portfolio

Geek Repo:Geek Repo

Github PK Tool:Github PK Tool

Final project for ITF Manual Testing Course

The scope of the final project for ITF Manual Testing Course is to use all gained knowledge throught the course and apply them in practice, using a live application.

Application under test:

API Documentation:

The final project will be split into 2 sections: Testing section and SQL section.

Tools used:

Functional specifications

-> enter here the functional specifications created in JIRA

1 Testing section

1.1 Test Planning

The Test Plan is designed to describe all details of testing for the X module from the OrangeHRM application.

The plan identifies the items to be tested, the features to be tested, the types of testing to be performed, the personnel responsible for testing, the resources and schedule required to complete testing, and the risks associated with the plan

1.1.1 Roles assigned to the project and persons allocated

1.1.2 Entry criteria defined

1.1.3 Exit criteria defined

1.1.4 Test scope

  • Tests in scope:
  • Tests not in scope:

1.1.5 Risks detected

  • Project risks:
  • Product risks:

1.1.6 Evaluating entry criteria

The entry criterias defined in the Test Planning phase have been achieved and the test process can continue.

1.2 Test Monitoring and Control

It will be done by generating periodic reports that reflect the current status of the test.

1.3 Test Analysis

The testing process will be executed based on the above requirements for the Dependents module. The following test conditions were found:

  • Enter test conditions here

1.4 Test Design

Functional test cases were created in Zephyr Squad. Based on the analysis of the specifications, the test design techniques used for generating test cases are:

Test cases: -> enter here test cases or at least the titles

The test cases with steps can be viewed here: test_cases.pdf

1.5 Test Implementation

The following elements are needed to be ready before the test execution phase begins:

  • enter here what needs to be ready for the test execution to begin

1.6 Test Execution

  • Test cases are executed on the created test Cycle summary: cycle_summary_execution.pdf
  • Bugs have been created based on the failed tests. The complete bug reports can be found here: created_bugs.pdf
    • enter here bug titles

1.7 Test Completion

  • Exit criteria was evaluated and passed
  • The traceability matrix was generated and can be found here: Traceability_matrix.csv
  • Test execution chart was generated, the final report shows.... -> describe the final report

-> enter here test execution report/chart

2 SQL section

About