UIUC-optimization / nsf-scheduler

Panel Scheduler for NSF.

Geek Repo:Geek Repo

Github PK Tool:Github PK Tool

nsf-scheduler

Panel Scheduler for NSF.

Contents

  1. General Information
  2. Code Overview
  3. Additional Constraints
  4. Installation and Usage
  5. Licensing Information
  6. Acknowledgements

Code Overview

Inputs

The NSF Scheduler is designed to schedule a set of panels to available rooms across a specified time period. The inputs to the scheduling code are:

  • Rooms: A list of rooms that are available for scheduling purposes. Each room has an integer ID, a name, a capacity, and then a list of boolean room features (e.g., whether or not the room has whiteboards) that can be used to differentiate between rooms.

  • Dates: A list of the dates in the scheduling period, along with a listing of when rooms are available in that time period. Default availabilities can be used to specify when all rooms are available (e.g., weekdays) or unavailable (e.g., weekends, holidays), and room-specific availabilities can be used to override the default behavior.

  • Organizers: A list of panel organizers. Each organizer has a name (not necessarily unique) and a set of one or more unique organizer keys that are used to associate panels with specific organizers.

  • Panels: A list of the panels in the scheduling period. Each panel has an integer ID, a name, an associated program directorate, an organizer key (which must either belong to one of the organizers or be empty if the panel has no specific organizer), a number of days for the panel (1, 2, or 3), a starting date, a size (number of panel members), and a list of boolean panel requirements that correspond to the room features (e.g., whether or not the panel needs whiteboards).

Example inputs are located at data/small/. Note that all input files must be specified in .csv format.

Constraints and Objective

The NSF scheduler attempts to assign panels to rooms subject to the following constraints:

  • Panels must start on the specified start date; they cannot be moved to another date (during the first phase of scheduling).

  • Multi-day panels must be assigned to the same room for each subsequent day.

  • No two panels can be assigned to the same room on the same date.

  • Panels can only be assigned to rooms that:

    • Are available for the duration of the panel;
    • Have sufficient capacity to hold all panel members;
    • Possess the features that the panel requires (e.g., if a panel requires whiteboards, it can only be assigned to a room that has whiteboards).

The scheduler may leave a panel unscheduled if it cannot find an available room for that panel. The objective is to maximize the number of scheduled panels (note that this objective treats all panels equally, regardless of how many days the panels require).

Algorithm

The algorithm does the following:

  1. Process input data and check for inconsistencies (e.g., a panel starting on a date not given in the input data, incomplete specifications of room features or panel requirements). The program will exit with an error message if inconsistencies are identified.

  2. Associate with each panel a set of panel requests, with each request corresponding to one of the dates in which the panel needs a room (e.g., a single-day panel has one associated panel request for a room on the starting date of the panel; a three-day panel has three associated panel requests, one on the starting date, one on the subsequent date, and one on the date two days after the starting date). Each date then has an associated set of panel requests.

  3. Separate the range of dates into a set of intervals such that the requests from each panel are never split into two separate intervals. (As a simple example, week-long intervals typically satisfy this requirement because panels are generally not scheduled over a weekend.) Separating the dates in this way ensures that the panels in one interval can be scheduled independently of the panels in the other intervals.

  4. Run a feasibility pre-test on the input data, identifying panel requests that cannot be satisfied (e.g., no room is available on the required dates that meets the size and feature requirements of the panel). Infeasibilities are noted but do not prevent the algorithm from constructing a schedule.

  5. Run one of the solvers (listed in the next subsection) to schedule the panels in each interval. Combine the schedules for each interval into a master schedule.

  6. Run a feasibility post-test on the resulting schedule to ensure that no constraints were violated (this is mainly used for debugging purposes).

  7. Optional: Attempt to schedule any unscheduled panels on alternate dates within the same week, while ensuring that rescheduling a panel does not cause a panel organizer to be double-booked on any date.

  8. Output the schedule and solution information to the appropriate files.

Solvers

There are currently three different solvers built into the scheduling code.

  • Exact: This solver uses a branch-and-bound approach to enumerate the possible schedules for an interval in order to find an optimal schedule. It operates by branching on all possible assignments of multi-day panels to rooms until only single-day panels are left, and then it uses a push-relabel maximum flow algorithm to optimally schedule the single-day panels subject to the assignments for the multi-day panels. Bounding is accomplished by relaxing the requirement that a multi-day panel be scheduled in the same room on every single date.

    For performance reasons, a time limit is imposed when solving each interval, with the best identified solution being returned once the time limit is reached. Because of this, the solver may not be able to verify optimality of the schedule in some cases.

  • Random: This solver selects a date at random within the date range and then attempts to schedule all panels that have a panel request for that date. This is done by selecting panel requests for that date at random and assigning the corresponding panel to one of the remaining available rooms chosen at random (the panel is left unscheduled if no available rooms remain).

  • Greedy: This solver processes each date interval by randomly selecting a date from within the interval and then using the push-relabel algorithm to schedule as many of the panel requests from that date as possible. This process is repeated until all dates within an interval are examined.

Outputs

There are three primary outputs from the scheduling algorithm:

  • Solution information in JSON format, including the number of panels scheduled and information about potential infeasibilities in the input data. Also contains information about how many panels were successfully rescheduled on a different starting date during the week.

  • A .csv file displaying the assignments of panels to rooms in a matrix format with columns indexed by date, rows indexed by room, and entries indicating the panel that is assigned to the room on the given date (an empty cell indicates that the room is not used on that date).

  • A .csv file listing the panels from the input data that were unable to be scheduled.

Additional Constraints

This section describes how to include additional constraints in the scheduling process without changing the code. This is done by making appropriate modifications to the inputs or by post-processing the output in some way.

Reserving Rooms for Future Use

To ensure that a specific room remains available for potential future use, it is necessary to identify the dates when that room should be free, and then mark the room as unavailable for those dates in the input file. The constructed schedule is then guaranteed to leave that room open on the specified dates.

Restricting Access to Rooms

The implementation of room features and panel requirements in the scheduling algorithm allows for panels to be scheduled in any room as long as that room has the features that the panel requires. However, it may be desirable to restrict access to rooms to only certain panels (e.g., only panels from a specific program directorate can be scheduled in a room). One way to accomplish this is to create directorate-specific room features. For example, the feature "G:PD1" can be used to associate rooms with Program Directorate 1. Then a panel that needs to be scheduled in a room associated with Directorate 1 will have the requirement "G:PD1".

However, this set of features alone would still allow other panels to be scheduled in directorate-specific rooms. To remedy this, an additional feature "G:GEN" can be used to indicate whether a room is available for general use. Panels that do not need to be in a directorate-specific room would then have a requirement that they be scheduled in a "G:GEN" room. For this to work, every panel must state that it either needs to be scheduled in a directorate-specific room (e.g., "G:PD1" = Y, "G:GEN" = N) or it needs to be scheduled in a general room ("G:PD1" = N, "G:GEN" = Y). If a panel does not belong to one of these categories, then it can still be scheduled in any room. This would make it necessary to decide up front whether a panel should be scheduled in a directorate-specific room or in a general room.

In many cases it may be preferable to allow the scheduler to decide whether a panel should be assigned to a directorate-specific room or a general room. This can be accomplished by introducing one additional room feature, "G:GEN+PD1", which corresponds to rooms that are available for both general use and for directorate-specific use. From the panel requirements perspective, a panel with the "G:GEN+PD1" requirement means that the panel should be scheduled in either a general room or a room associated with Directorate 1.

This can be summarized as follows:

  • Introduce three new room features: "G:GEN", "G:PD1", and "G:GEN+PD1"
  • Rooms that are available for general use possess the features "G:GEN" and "G:GEN+PD1"
  • Rooms that are restricted to Directorate 1 possess the features "G:PD1" and "G:GEN+PD1"
  • Panels that must be assigned to a general room have the requirement "G:GEN"
  • Panels that must be assigned to a room restricted to Directorate 1 have the requirement "G:PD1"
  • Panels that can be assigned to either a general room or a room restricted to Directorate 1 have the requirement "G:GEN+PD1"

The above process can be extended to incorporate directorate-specific rooms for any number of directorates.

Installation and Usage

The latest version of the code can be found in the nsf-scheduler repository on Github.

Requirements

The project requires a C++ compiler and the STL. The program is executed from the command-line.

Installation

The Makefile in the code directory can be used to compile the code on most Linux systems. For Windows, the Visual Studio 2012 project files can be used to build the code (this may require some modifications).

Running the Code

To run the code, simply execute the following in the code/ directory:

./scheduler <roomsFile> <datesFile> <organizersFile> <panelsFile>

With the example data, this would be:

./scheduler ../data/small/rooms.csv ../data/small/dates.csv \
            ../data/small/organizers.csv ../data/small/panels.csv

The following additional arguments are optional:

  • Specify the file for printing solution information (JSON format) (Defaults to stdout):

    -o <outputFile>
    
  • Specify the schedule file for printing the matrix of panel assignments by date and room (CSV format) (Will not print if no file is specified):

    -s <scheduleFile>
    
  • Specify the file to printing the list of unscheduled panels (CSV format) (Will not print if no file is specified):

    -u <unscheduledFile>
    
  • Use the exact solver (selected by default):

    -e
    
  • Use the greedy solver:

    -g
    
  • Use the random solver:

    -r
    
  • Specify the number of random restarts to use with the random and greedy solvers:

    -n <numRandomRestarts>
    
  • Print additional information during the scheduling process:

    -p
    
  • Allow the scheduler to shift any unscheduled panels to alternate dates within the same week in order to reschedule them:

    -ss
    

Licensing Information

This project is released under the University of Illinois/NCSA Open Source License. See the LICENSE file for more details.

Acknowledgements

This code was written by David R. Morrison and Jason J. Sauppe while studying under Dr. Sheldon H. Jacobson in the Department of Computer Science at the University of Illinois at Urbana-Champaign.

This work has been supported in part by the National Science Foundation Graduate Research Fellowship Program (DGE-1144245). Any opinion, findings, and conclusions or recommendations expressed in this material are those of the author(s) and do not necessarily reflect the views of the National Science Foundation.