Energy meter solar kit installation in EU
MassimilianoBiancucci opened this issue · comments
Hi,
I bought the solar kit, and I realized that is designed for a two-phase system after purchasing it, while in my country I have a single-phase grid supply at 230V 50Hz (1 phase + neutral), and I would like to know if I should be able to configure the system anyway using only the standard calibration, and without installing the CT2 and the SCT2 clamps, or I need to change the code and recompile it.
Have you any hint for such type of configuration??
Hi
Deleted my post when I realized this was for the the 2 phase version. I have the 6 channel board. The question remains though.