tdewin / rps

Restore Point Simulator for Veeam

Geek Repo:Geek Repo

Github PK Tool:Github PK Tool

Help in Cloud Connect Calculation

JasonNuss opened this issue · comments

So I'm trying to figure out how to properly calculate cloud connect. Obviously it's a copy job but what I'd like to is add a weekly synthetic full. Not sure how to do that in the calculator. say I have 10TB with 10% Change Rate adn 50% compression. I would assume it would be initial full of 5 TB with dailies of 500GB. I would assume my max storage would be 2x 5TB(initial full plus weekly) plus 6 X 500GB= 13TB but calculator shoes 15500. Any thoughts?

image

You have a dependency chain, e.g the 7 point is dependent on the previous point eg 8 (7), (7) meaning, it is kept for restore point 7, as such the retention can only be applied after this incremental is the full. This reflects the worst case scenario

Now RPS itself is not "V11 compatible" but the estimation is close to what you want

I'm working on a newer calculator that drops a lot of the legacy modes but the plan is to merge it in a bigger calculator that does more then only storage point calculation but involves more people.