emaadmanzoor / datasets

Software Engineering Analytics research at University of Wollongong (SEA@UOW)

Geek Repo:Geek Repo

Github PK Tool:Github PK Tool

Datasets

We provide the datasets used in our empirical studies and evaluations. The description is provided according to the type of datasets and the associated work.

If you use our dataset, please cite our relevant paper in your publication. The bib is also provided.


There are two groups of datasets according to the dataset's characteristics.

You can also find preprints in the folders.

Visit our homepage for more informaiton SEA@UOW


bib

  • MSR2015: Characterization and prediction of issue-related risks in software projects

[1] M. Choetkiertikul, H. K. Dam, T. Tran, and A. Ghose, “Characterization and prediction of issue-related risks in software projects,” in Proceedings of the 12th Working Conference on Mining Software Repositories (MSR), 2015, pp. 280–291.

@inproceedings{Morakot2015,
title = {{Characterization and Prediction of Issue-Related Risks in Software Projects}},
author = {Choetkiertikul, Morakot and Dam, Hoa Khanh and Tran, Truyen and Ghose, Aditya},
booktitle = {Proceedings of the 12th IEEE/ACM Working Conference on Mining Software Repositories (MSR)},
doi = {10.1109/MSR.2015.33},
isbn = {978-0-7695-5594-2},
issn = {21601860},
pages = {280--291},
publisher = {IEEE},
url = {http://ieeexplore.ieee.org/document/7180087/},
year = {2015}
}
  • ASE2015: Predicting delays in software projects using networked classification

[1] M. Choetkiertikul, H. K. Dam, T. Tran, and A. Ghose, “Predicting delays in software projects using networked classification,” in Proceedings of the 30th IEEE/ACM International Conference on Automated Software Engineering (ASE), 2015, pp. 353–364.

@inproceedings{Choetkiertikul2015,
title = {{Predicting delays in software projects using networked classification}},
author = {Choetkiertikul, Morakot and Dam, Hoa Khanh and Tran, Truyen and Ghose, Aditya},
booktitle = {Proceedings of the 30th IEEE/ACM International Conference on Automated Software Engineering (ASE)},
doi = {10.1109/ASE.2015.55},
isbn = {9781509000241},
pages = {353--364},
year = {2015}
}
  • EMSE2017: Predicting the delay of issues with due dates in software projects

[1] M. Choetkiertikul, H. K. Dam, T. Tran, and A. Ghose, “Predicting the delay of issues with due dates in software projects,” Empir. Softw. Eng., vol. 22, no. 3, pp. 1223–1263, 2017.

@article{Choetkiertikul2017,
title = {{Predicting the delay of issues with due dates in software projects}},
author = {Choetkiertikul, Morakot and Dam, Hoa Khanh and Tran, Truyen and Ghose, Aditya},
doi = {10.1007/s10664-016-9496-7},
issn = {15737616},
journal = {Empirical Software Engineering},
number = {3},
pages = {1223--1263},
publisher = {Empirical Software Engineering},
volume = {22},
year = {2017}
}
  • IEEE TSE2017: Predicting Delivery Capability in Iterative Software Development

[1] M. Choetkiertikul, H. K. Dam, T. Tran, A. Ghose, and J. Grundy, “Predicting Delivery Capability in Iterative Software Development,” IEEE Trans. Softw. Eng., vol. 14, no. 8, pp. 1–1, 2017.

@article{Choetkiertikul2017,
title = {{Predicting Delivery Capability in Iterative Software Development}},
author = {Choetkiertikul, Morakot and Dam, Hoa Khanh and Tran, Truyen and Ghose, Aditya and Grundy, John},
doi = {10.1109/TSE.2017.2693989},
issn = {0098-5589},
journal = {IEEE Transactions on Software Engineering},
number = {8},
pages = {1--1},
volume = {14},
year = {2017}
}

About

Software Engineering Analytics research at University of Wollongong (SEA@UOW)