ebtrac / CSE622-Final-Project

Final project for simulations class

Geek Repo:Geek Repo

Github PK Tool:Github PK Tool

CSE622-Final-Project

Final project for simulations class

Project Requirements

Masters Project Expectations in the Report Your report for the purpose of meeting the MS or MENG project option will be assesed based on the follwing items:

  1. Evaluate expectations for the following characteristics of the CSE MS/MEng Thesis or MS/Meng Project:
  2. Needs assessment and system requirements (what problem are you trying to solve?)
  3. Systems specification and standards requirements
  4. Realistic design constraints.
  5. Security and privacy considerations.
  6. System design diagrams - detail all interfaces between the environment and the components
  7. Hardware/software overview
  8. Economical, technical and time and constraints So, please make sure that you explicitly highlight these in your final project report.

About

Final project for simulations class


Languages

Language:Jupyter Notebook 100.0%