ansible-lockdown / RHEL7-STIG

Ansible role for Red Hat 7 STIG Baseline

Geek Repo:Geek Repo

Github PK Tool:Github PK Tool

Updates coming Soon

uk-bolly opened this issue · comments

Hello,

For those how haven't joined the community (https://groups.google.com/g/ansible-lockdown) and watching the ansible-lockdown repository for rhel7-stig. We are trying to inform as many of you as possible of upcoming changes and improvements we are hoping to release very shortly.

Please see the community notification below.

Hello,

Thank you to everyone in the Ansible-Lockdown community who has contributed to RHEL7 STIG/CIS. Our team at MindPoint Group has been working with the entirety of the Ansible-Lockdown project, and we have some significant updates for both RHEL 7 STIG and CIS. With these updates, some larger changes have been made. I have these changes/updates outlined below.

Testing:

CI/CD - We have implemented some automated testing pipelines to test pull requests into the devel and main branches. With the current workflow, the community will PR into the devel branch (never the main branch) for review by the administrators. When your PR is created, the first check will remain the DCO check. The second check is a functional testing pipeline that will automatically perform a functional test of the branch the PR is initiated from. Once both tests pass, someone from the Administrator Team will review the changes and merge them into the devel branch. From there, an additional review is completed before the devel branch is merged into the main branch. Only the Admin Team will perform PRs/merges into the main branch. There is also an automated pipeline for PRs from devel to main. Please do not edit the .github/workflows files since those are used as part of the pipeline.

Compliance Checking – MindPoint Group has been working to create our own compliance audit scan tool. The tool uses a goss framework executable to run custom checks that we have created. The goal is to provide a more thorough check for control compliance and decrease the number of false positives/negatives. For example, it will check the configuration file related to the control and as well as checking if that configuration is active. With a smarter scan, we can hopefully identify attempts to trick scanners as well (for example stacking a parameter in a config file where the first instance is enabled and second disabled. Most audit tools search for the first instance but the application might look for the last instance of the parameter, thus making the scanning tool think it's enabled). In testing, we have found that our audit scan runs significantly faster than other audit tools, reducing audit times. Our audit tool and profiles will have their own repositories in the Ansible-Lockdown org, but within the remediation role there will be an integrated way to incorporate the audit. Keep an eye out for the audit tools as they are released. We plan on developing a goss audit profile for each current remediation role. Going forward, we plan to release a remediation role and goss audit tool profile simultaneously.

Role Updates:

RHEL 7 STIG/CIS – We have re-written much of the RHEL 7 STIG and CIS roles to increase clarity and readability and address some functionality items. We performed these updates while creating our goss testing framework for each of these roles. We plan on pushing our update to the devel and main branches. We will move the current devel and master branches to a devel_stable_ and master_stable_ branch in the respective repositories. Accordingly, community members who rely on the current version can still use that version going forward; this process will not remove what is currently there. The latest versions of the roles have also been updated to comply with the latest benchmarks.

Role Architecture – All roles will change with regard to the structure in the tasks folder. Taking CIS as an example, there will be a folder per section and yaml files for each sub-section. For example control 1.2.1 in CIS will be located in RHEL7-CIS/tasks/section_1/cis_1.2.x.yml. The cis_1.2.x.yml file will contain all controls related to section 1.2.x. This will hopefully make updates to roles a bit easier with less risk. This matches the architecture of our audit tool, creating consistency across remediation and audit platforms. The end goal is to repeat this architecture (the best we can) on STIG roles, but we are starting with CIS.

Existing PRs and Issues – With all of these changes comes the task of cleaning up existing PR’s and issues. Our plan is to close all of the existing PR’s and issues because of the re-work. Our team is growing and should be able to stay on top of the new issues and PRs as they come in.

Again, I would like to thank the community for your involvement in this project. The input and work from the community has contributed significantly to the success of this project. Please keep an eye out for these changes, which will be rolling out in the coming weeks.

-George

Hello,
We have merged our changes into the devel branch and closed all open issues/PRs. Please use the latest version in the devel branch and let us know if there are any issues that need to be addressed. We are using the next week or so as a test/dev cycle before doing a full on 1.0.0 release in the main branch.

-George

Releases are now live and tagged