IEEE33BW-mod case for N\N-1 operational planning

Geek Repo:Geek Repo

Github PK Tool:Github PK Tool

case33Py

Distribution network plan based on the N-1 safety condition in Moded IEEE-33BW case

2020.11.29 v0.1
Author:Ran Zhu @ School of Cyber Engineering and Science, SEU
For example test

Example:

image

References:

  • IEEE33BW case —— 1989, M.E.Baran, TPS
  • DER Installation Position —— 2019, Xu, TSG
  • Load Data —— Commission for Energy Regulation (CER). (2012). CER Smart Metering Project - Electricity Customer Behaviour Trial, 2009-2010 [dataset]. 1st Edition. Irish Social Science Data Archive. SN: 0012-00. www.ucd.ie/issda/CER-electricity
  • PV\WT Weather Data —— https://www.renewables.ninja/
  • Generation Method —— 2016, Stefan, Energy https://doi.org/10.1016/j.energy.2016.08.060.
  • Cable —— 2011, Mancarella, IET-GT
  • Brach Flow Model —— 1989, M.E.Baran, TPS
  • Brach Flow Model-AR —— 2013, M.Farivar, TPS
  • Directed Multi-Commodity Flow—— 2020, S.Lei, TSG

Data Set

  1. The load data of 1500 households in lieerick(52.6653 -8.6238) and Ennis (52.8463,-8.9807) from the Irish Power Supply Authority (half an hour granularity) are used for the load. image image

  2. Weather parameters refer to the MERRA open source meteorological satellite database

  3. The photovoltaic modeling is based on GSEE

  4. The wind turbine modeling is based on the Vestas V90 2000 standard

moded IEEE-33BW case